Hampden - When? - TA specific - Tartan Army Message Board Jump to content

Hampden - When?


BMan

Recommended Posts

Anyone have any idea the timeframe for Hampden getting back to hosting football matches? What exactly was done to it for the Commonwealth games? I would have thought it would have been restored by now.

The whole pitch area was raised something like 2m and the running surface was a raised surface formed from the existing track.

I was driving past the other day and there was still a lot of work going on, if they're reduccing the whole area and removing it in wagons then it will take quite a while to remove everything then restore it.

Couple this with trying to do it in the wet weather then it's not entirely straight forward.

They obvioulsy anticipate that it'll be ready for the Gibraltar game, so it could be anytime between the end of Nov and March.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...


×
×
  • Create New...